SANITARY SEWERAGE SYSTEM OF THE CITY OF MATAGALPA
The project to expand and improve the sanitary sewerage system is aimed at solving the current deficit situation and providing the city of Matagalpa with a drinking water and sanitary sewerage system with the necessary capacity to meet the demand of the population expected by the end of the design period 2023 – 2043. The […]
STUDY OF MOBILITY AND DEMAND FOR PUBLIC TRANSPORT IN THE CITY OF MANAGUA
The project will be developed in the capital city of the Republic of Nicaragua, Managua, under three types of areas of influence: study area, planning area and project location area. As part of the scope of the project, it is to carry out a conceptual, functional and operational design, including a study of the relocation […]
IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM IN THE CITY OF MASAYA, NICARAGUA
The work involved the supervision of the following projects: Construction of pipelines and distribution lines for the improvement and expansion of the drinking water system in the city of Masaya Construction and rehabilitation of storage tanks for the improvement and expansion of the drinking water system in the city of Masaya construction and drilling of […]
SUSTAINABILITY OF THE RURAL WATER AND SANITATION SECTOR IN MUNICIPALITIES OF EL TORTUGUERO, NICARAGUA
Support and technical facilitation of pre-feasibility and technical design studies for 7 water, sanitation and hygiene projects in the following communities: Municipality of mouth of the Rio Grande: La Barra community, Karawala community Municipality of El Tortuguero: El Cedro community, Waspado community, Kasmitinge community Municipality of La Cruz del Rio Grande: El Cañal community (El […]
IMPROVEMENT OF THE LA CURVA ROAD – NEW GUINEA – UNITED NATIONS, NICARAGUA
The project consists of the improvement of 84 km of road. The area of influence of the project is composed of the La Curva junction, the intersection of the NIC-7 and NIC-71 highways, in the department of Chontales passing through the municipality of El Coral, passing through the town of El Triunfo, in the department […]
IMPROVEMENT AND EXPANSION OF DRINKING WATER SYSTEMS IN THE CITY OF MASATEPE
The project to expand and improve the drinking water system of the city of Masatepe, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2021-2041 design period. AP component […]
IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM OF THE CITY OF MATAGALPA
The project to expand and improve the drinking water and sanitary sewage system of the city of Matagalpa, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2023-2043 design […]
IMPROVEMENT OF THE DRINKING WATER AND SEWERAGE SYSTEM IN THE CITY OF SAN JORGE AND BUENOS AIRES
The works covered by the Project are, in summary, the following: Drinking water component. Collection work: Three drilled wells 500 gpm (31.55l/s),Prof. 56 m and Diam 18”. pumping stations, Three stations with submersible pump and motor of 75, 74 and 69 HP ; Drive line, 8.04 Km of HFD pipes, Diam 200 mm, 250 mm […]
STUDIES AND DESIGNS FOR THE IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM OF DIRIAMBÁ
The works covered by the Project are, in summary, the following: Drinking water component. Collection work: 20 wells drilled from 14 to 22 l/s, Prof. from 320 to 380 m and Diam of 18″. Pumping stations, 20 Submersible pump and motor stations Drive line Supply and installation of 11,586 km of HFD piping including HFD […]
HOSPITAL OF NUEVA SEGOVIA
VIELCA INGENIEROS S. A. is in charge of the Supervision of the Replacement Works and Equipment of the Departmental Hospital of Nueva Segovia in Nicaragua. Activities carried out under this project: Supervision (technical, economic, environmental, social and administrative) of the contractor. Monitoring of supply. Reception, installation and verification of equipment. Traducir Monitoring of compliance with […]