FINAL DESIGN OF THE WASTEWATER TREATMENT SYSTEM FOR THE CITY OF BILWI

The work carried out consisted of the drafting/elaboration of the Final Design of the Wastewater Treatment System (PTAR of Bilwi). The planned works consist of the following actions: The Bilwi PTAR has been designed for a flow of 15,769.7 m3/day; that is 164,264 inhabitants with an endowment of 120/l/day/inhabitant. As for the treatment line, it […]