FILTRATION OF MICROPLASTICS ACCORDING TO THE CAPTURE MODEL IN MEDITERRANEAN MARINE ORGANISMS (REMOURE)

eliminación de plásticos

Participants: Global Omnium Medioambiente, S.L., Instituto Tecnológico Metalmecánico, Mueble, Madera, Embalaje y Afines (AIDIMME), Universidad Católica de Valencia (UCV), Control de Vertido Industrial (CVI) y Vielca Ingenieros, S.A. Summary:The REMOURE project aims to investigate the feeding apparatus of various marine species with high microplankton capture efficiency, to replicate it and apply it to the removal […]

WWTP AND BORRIOL WASTEWATER COLLECTOR

edar borriol

At present, the municipality of Borriol has a WWTP with insufficient treatment capacity for the quantity of wastewater it produces. The urban growth foreseen in the current planning, as well as the growing industrial development and the increase in the seasonal population, aggravate the problem. This is why, although industrial areas are planning the development […]

NEW WWTP OF MONCOFA

nueva edar moncofa

The construction of this new WWTP solves the problems posed by the former Moncofa WWTP and the Belcaire WWTP. The former Moncofa WWTP is less than 200 m away. of the buildings on the beach. It includes capacity problems due to its low slope and with the discharge point at 300 m. from the mouth […]

REFORM OF THE WWTP OF CASTELLÓN

REFORMA DE LA EDAR DE CASTELLÓN

The main objectives to be achieved with this project to improve and reform the Castellón WWTP, in order of priority, are: Minimize the number of unit processes involved in the water and sludge line. This implies a change in the type of treatment, i.e. a change from a conventional activated sludge process to a prolonged […]

DRINKING WATER TREATMENT PLANT FOR THE MUNICIPALITY OF LORIGUILLA

ESTACIÓN DE TRATAMIENTO DE AGUA POTABLE PARA EL MUNICIPIO DE LORIGUILLA

Work on a drinking water treatment plant is being carried out in the municipality of Loriguilla, which is currently supplied by a drinking water treatment plant using reverse osmosis. The project aims to develop a solution to deal with the following situations: Stopped by any cause of the osmosis plant. Depletion of allotted well water […]

WWTP PEÑÍSCOLA

EDAR PEÑISCOLA

The project defines the facilities of a new Wastewater Treatment Plant (WWTP) for the treatment of wastewater in the municipality of Peñíscola, reserving space for future expansion. It includes new sewerage pipelines from the urban area to the site of the WWTP. There is also the refurbishment and rehabilitation of the existing network, as well […]

CONSTRUCTION PROJECT FOR THE REHABILITATION OF THE V-23 MOTORWAY

rehabilitación del firme de la autovía V-23

Drafting of the construction project for the rehabilitation of the highway V-23 along the 10.5 km of its route for each of the two directions of traffic. The project includes the following work: Previous Studies of Topography, Traffic and Road. Dimensioning of the new road. Improved safety through new signalling, marking and containment systems. Traffic […]

CONSTRUCTION PROJECT OF REHABILITATION OF THE ROAD OF THE V-30 MOTORWAY

rehabilitación del firme de la autovía V-30

Drafting of the construction project for the rehabilitation of the main road of the V-30 motorway along the 17 km of its route for each of the two directions of traffic and for the 10.4 km stretch of slow track towards the Port of Valencia. The project includes the following work: Previous Studies of Topography, […]

ROAD CV-32 DE LA GOMBALDA

proyecto constructivo de la carretera CV-32

The purpose of this Construction Project is to define the construction works for the doubling of the CV-32, De la Gombalda road, between Pks 3+500 and 5+500, in the municipalities of Museros and Massamagrell. This section is an area where there are frequent queues at peak times due to the capacity constraints it entails in […]

UPGRADING AND MODERNISATION OF THE ELECTRICAL FACILITIES OF THE MARIA CRISTINA DAM

presa maria cristina

Drafting of the project to improve and modernize the electrical facilities of the Maria Cristina Dam.   The works carried out consisted of: Replacement of the Transformation Centre. Replacement of exterior lighting lines and luminaires. Replacement of interior lighting and installation of emergency lighting. Replacement of power lines to switchboards and receivers. Installation of a […]