CONTROL AND MONITORING OF MARINA BEACH IMPLEMENTATION
Detailed description of the project The work of the contract consisted of: the supervision and control of the implementation project at all stages of its approval; Monitoring of the work (technically and economically) Control of the documentation required for its proper processing And technical support to the management of the Works. The work includes the […]
CONSTRUCTION WORK FOR THE NEW WWTP OF ALCALÀ DE XIVERT
Detailed description of the project The following works are planned: New system of sewerage pipes (3,734 m driven and 1,140 m in gravity) and two new pumping stations, to convey the wastewater generated in the coastal area of Alcossebre to the new treatment plant of Alcalá de Xivert. Construction of the new Alcalà de Xivert […]
ENLARGEMENT WITH TERTIARY TREATMENT OF QUART-BENAGER WWTP
Detailed description of the project The works carried out consist of the extension of the Quart-Benáger WWTP, so that a tertiary treatment for the design flow, 60,000 m3/d (300,000 inhab-eq) is incorporated into it. The works have consisted of: Interception of the outlet water of the secondary decanters prior to its passage to disinfection; diverting […]
MANAGEMENT OF THE CONSTRUCTION WORK FOR THE AUXILIARY MEDICAL CENTRE OF THE POBLA DE BENIFASSA
Detailed description of the project The works consist of the construction of an auxiliary medical centre in the Pobla de Benifassa, Castellón. The area of the Project has a total usable area of 239.18 m2 divided into the basement, which contains the garage and storage room; the ground floor, which is the public consultation area; […]
MANAGEMENT OF THE RENOVATION WORKS OF THE OLD WWTP OF BENIDORM
Detailed description of the project This WWTP was built in 1984, and although later works have been carried out to extend it, these have not been enough, so it has been necessary to undertake these works, aimed at solving the various deficiencies that it presented. The works have consisted of the reform of the Benidorm […]
COLLECTOR WORKS IN BENIDORM AND VILLAJOYOSA AND EXTENSION OF THE BENIDORM WATER TREATMENT PLANT
Detailed description of the project The work consisted of the construction of an extension of the existing WWTP and a network of Collectors and Impulses next to the corresponding Pumping Stations for feeding the WWTP and the collector for the Reuse of Treated Water and another for Dumping into the Sea. With the expansion of […]
LANDSCAPE STUDY OF THE GENERAL PLAN OF TORÁS T.M.
Within the framework of the revision of the Municipal Urban Planning, through the drafting of the General Plan of Torás. This master plan was accompanied by a Landscape Study. The Landscape Study identifies the different existing units, from the factors orography, vegetation and anthropic uses. The most valuable landscapes are identified, as well as landscape […]
CONSTRUCTION PROJECT FOR THE GENERAL COLLECTORS AND W.W.T.P. OF THE MUNICIPALITY OF XILXES
Detailed description of the project The following works are planned: New system of sewerage pipes (7,200 m) and pumping stations: due to the inadequacy of the current general sewer compared to the growth forecasts of the municipality, the construction of a network covering all the new urban areas, the beach core and the village of […]
BUILDING PROJECT FOR LEISURE PREMISES
Detailed description of the project The works covered by this project consist of the urbanisation and the construction of buildings (ships) on plots A and B. As well as an area of premises on block C. Building for premises: The building has an arched floor that follows the northern line delimiting the plot. In this […]
PROJECT FOR THE CONSTRUCTION OF A WATER TREATMENT PLANT IN LA NUCIA
Detailed description of the project The Municipality’s Master Plan for Exploitation includes the installation of a new water purification plant to eliminate the sporadic events of increased water turbidity and the presence of geosmin (a substance produced by some bacteria, which gives the water a taste and smell of mouldy soil). These events occur in […]