SEWAGE TREATMENT PLANT CALAMOCHA
The wastewater from the municipality of Calamocha was discharged into the Jiloca River with the consequent ecological and landscape impact. The Calamocha Wastewater Treatment Plant was built by the Aragonese Water Institute, under the government of Aragon, and co-financed with ERDF funds from the European Union. The calamocha WWTP is located about 2000 meters from […]
MANAGEMENT OF THE EXTENSION OF THE ALGOROS AND CARRIZALES SEWAGE TREATMENT PLANTS IN ELCHE
Detailed description of the project In view of the operational difficulties of both treatment plants and the forecast of a continuous population growth in the area, it became necessary to build two new plants conditioned by forecasts of future flow growth, as well as the proximity of the Natural Park of the Lagunas de Santa […]
MANAGEMENT OF IMPROVEMENT WORKS AT THE TORREVIEJA WASTEWATER TREATMENT PLANT
Detailed description of the project Since the start of operation of the WWTP in 1982 and subsequent extensions, the inlet flows have continued to increase, due to the population growth, especially during the summer season, reaching now, to equalize during the summer months, the design flows of the plant. It is therefore necessary to extend […]
DIRECTORATE OF WORKS FOR THE DRINKING WATER MASTER PLAN OF THE MUNICIPALITY OF DENIA
Detailed description of the project The actions carried out focus on: New EDAS (desalination plant) using Beniadlá reverse osmosis for the purification of 8,000 m3/day. Improvements to Racons EDAS (16,000 m3/day). They consist of: the installation of a system for generating and dosing ozone from oxygen, the completion of the sludge treatment line generated during […]
ACCESS TO THE PORT OF CASTELLÓN
The work consisted of assisting the Optional Directorate for the control and supervision of the works, including the coordination of safety and health and the environmental monitoring necessary for the execution of the works, as well as the drafting of the amended project. That the main characteristics of the work executed are: Construction of a […]
IMPROVEMENT OF ROAD SAFETY IN CV-15 FROM PK 53 TO 56 AND PK 60 TO 61
The road of action is the CV-15 that connects the municipalities of La Pobla Tornesa and Vilafranca continuing to the edge of the community. The project includes action on three sections of this road: Action 1. Section from PK 53.30 (Coll de Ares) to PK 55.80. The action consists of improving road safety by improving […]
BASIC DESIGN AND CONSTRUCTION PROJECT OF THE CV-70 ROAD VARIANT. ALCOI-BENIDORM
The road of action is the CV-70 that connects the municipalities of Alcoi and Benidorm has a length of 45 km and connects the regions of Alcoià and Comtat in the interior of the Valencian Community with the coastal area, crossing the Sierra de Aitana. It is a mountain road with a winding route and […]
PROJECT FOR THE CONSTRUCTION OF THE ACCESS TO THE PORT OF VILLAJOYOSA
The aim of the project is to completely define the improvement of the route and road safety of the access road to the Port of Villajoyosa, reorganizing the accesses and intersections, giving the road an urban character by introducing sidewalks and bike lanes, and trying to fit the action within the reserve foreseen in the […]
EXTENSION TO THREE LANES ON THE A-7 MOTORWAY, VALENCIA RING ROAD (BY-PASS)
That this work consisted of assisting the Optional Directorate for the control and supervision of the works, including the coordination of safety and health and the environmental monitoring necessary for the execution of the works, as well as the drafting of the amended project. The main characteristics of the work executed are: Extension of a […]
CONSTRUCTION PROJECT OF THE RIOLA VARIANT
Currently, the CV-505 and CV-511 roads have an urban crossing section passing through the town of Riola, giving rise to two future variants, the southern one connecting to Fortaleny (connection of the CV-505 with the CV-511) and the western one, a variant to the CV-505 road. The subject of this project will be the southern […]