ENVIRONMENTAL RESTORATION PROJECT OF THE AMADORIO RIVER
Detailed description of the project The works consist of the environmental upgrading of a stretch of the Amadorio River between the railway bridge and the sea, with a length of approximately 560 m and a budget of € 3,656,025. The solution adopted consists of the following actions: – Demolition of buildings in precarious condition, with […]
URBANIZATION PROJECT OF THE IV PHASE OF THE INDUSTRIAL ESTATE OF ALMANSA (ALBACETE)
The area of the Urbanization Project has an area of 270947.20 m2, of which 96.433.30 m2 correspond to endowment use, 9. 490. 40 m2 to tertiary use, 564. 00 to private endowment use and the rest 164. 459. 0 m2 correspond to industrial use. The work includes: General land movement of the sector. Dimensioning of […]
HYDROLOGICAL STUDIES OF SECTIONS 1 AND 2 AND SECTION 3 OF THE MONTGÓ COLLECTOR IN DENIA
Description of the project Topographical survey of the environment, revision and updating of previous hydrological studies, carrying out hydraulic calculations as well as structural calculations, design of singular works, including graphic description, definition of technical specifications and economic evaluation of the previous actions of the works to be carried out, the main characteristics of which […]
URBANIZATION PROJECT IN THE MUNICIPAL TERM OF NÁQUERA
The area of this Urbanization Project has an area of 1,547,650. 16 m2, of which 650,000. 00 m2 corresponds to a Golf Course, and the rest, i. e. 897,650. 16 m2 corresponds to residential use with a total of 1,786 homes. The work includes: General land movement of the sector. Dimensioning of vials with replanting […]
RENOVATED URBANIZATION PROJECT IN MISLATA (VALENCIA)
The area of action has an area of 23,000 m2 pedestrian, destined to be the square of the new City Hall. The work carried out in the Project is: General land movement of the sector. Dimensioning of firm of the square and the rest of pedestrian areas. Sewage network: waste water collected through 427. 73 […]
CONSTRUCTION WORK FOR HIGH STORAGE WAREHOUSE IN MURO DE ALCOY
Detailed description of the project The works carried out included two projects: “Storage and Regulation Deposits and Upstream Distribution Networks at Muro de Alcoy” and “Storage and Regulation Deposits and Upstream Distribution Networks at Alquerías de Aznar”, between the two projects, the joint treatment system for treated water was implemented at the Font de la […]
PROJECT AND MANAGEMENT OF URBANIZATION AND TWO UNUSED BUILDINGS IN PEÑÍSCOLA
The works covered by this project consist of the urbanisation and the construction of buildings (ships) on plots A and B. As well as an area of premises on block C. Building for premises: The building has an arched floor that follows the northern line delimiting the plot. In this way it seems to be […]
MODERNISATION OF IRRIGATION IN THE MUNICIPALITIES OF SIMAT, BENIFAIRÓ AND TAVERNES DE LA VALLDIGNA
Description of the project The project consisted of modernising the irrigation method in the area of the municipalities of Simat, Benifairó and Tavernes de la Valldigna, located in the Comarca de la Safor (Valencia). The planning for the localized irrigation of this area has been thought of based on the construction of two reservoirs for […]
EMERGENCY SANITATION WORKS IN THE COASTAL AREA BETWEEN BENICASSIM AND CASTELLÓN
Detailed description of the project The emergency works connect the Benicàssim sewerage network and the Castellón sewerage network so that during the summer the excess of the Benicàssim network that cannot be treated at the Benicàssim WWTP can be diverted to the Castellón WWTP. There is a new DN-500 ductile cast iron pipe that connects […]
PROJECT FOR THE EXTENSION OF THE MUSKIZ SEWAGE TREATMENT PLANT (BIZCAYA)
THE WORKS HAVE CONSISTED IN THE DRAFTING OF THE NEW WWTP PROJECT COMPOSED OF WELL AND GRID OF COARSE AND PUMPING HEAD, REACTOR AND BIOLOGICAL TREATMENT MBBR , TERTIARY TREATMENT WITH MICROFILTRATION AND UV DISINFECTION. ENERGY EFFICIENCY IMPROVEMENTS WERE ALSO MADE WITH WIND TURBINES AND PHOTOVOLTAIC FACILITIES