The work consisted of the Drafting of the Update of the Construction Project of the 1st Phase of the Adaptation of the Crossing of the EI-10 between the “Figueretes” and “Can Misses” links.
It is a project for the redevelopment of the aforementioned crossing which has a length of 1 km and a width of approximately 40 m with a typical section formed by a central boulevard of 14 m.
Noteworthy is the execution of a lower step for access to the CETIS building through a reinforced concrete frame to be executed on site.
The work was carried out in the following phases:
- Phase I: initial consultation phase, preliminary work and services concerned
- Phase II: Drafting of the project update
- Phase III: Study and resolution of claims and amendment of draft