Drafting of the construction project for the rehabilitation of the main road of the V-30 motorway along the 17 km of its route for each of the two directions of traffic and for the 10.4 km stretch of slow track towards the Port of Valencia.
The project includes the following work:
- Previous Studies of Topography, Traffic and Road.
- Dimensioning of the new road.
- Improved safety through new signalling, marking and containment systems.
- Traffic diversions.