DENIA, SPAIN

HYDROLOGICAL STUDIES OF SECTIONS 1 AND 2 AND SECTION 3 OF THE MONTGÓ COLLECTOR IN DENIA

Working field

Hydraulics and water treatment

Client

Ending Year

2011

Budget

4,745,652.05 $

Description of the project

Topographical survey of the environment, revision and updating of previous hydrological studies, carrying out hydraulic calculations as well as structural calculations, design of singular works, including graphic description, definition of technical specifications and economic evaluation of the previous actions of the works to be carried out, the main characteristics of which were:

  • Section 1-A: section 2 ́50 x 1 ́60 m, with 220 m. of length and 0,955 % of gradient. Design flow rate 20 m3/ s.
  • Section 1-B: section 2 ́60 x variable 1 ́60 m to 2 ́20 m, with 240 m. of length and 0,379 % of gradient. Design flow rate 20 m3/ s.
  • Section 2: section two cells of 3.50 x variable 2 ́00 m to 2 ́20 m, with 400 m. length and 0.425 % slope. Design flow rate 55 m3/ s.
  • Stage 2: section two cells of 4.50 x 2 ́00 m, with 420 m. of length and 0,333 % of gradient. Design flow 70 m3/ s.

FEATURED

PROJECTS

MUNICIPIO DE SAN PABLO DE TACACHICO, EL SALVADOR