ALICANTE, SPAIN

WORKS BY THE GENERAL COLLECTORS AND WWTP OF NOVELDA AND MONFORTE DEL CID

Working field

Hydraulics and water treatment

Client

MINISTERIO DE MEDIO AMBIENTE Y MEDIO RURAL Y MARINO

Ending Year

2009

Budget

16.590.764,64 €

Detailed description of the project

The works consist of the construction of the collector system and a new treatment plant using biological treatment in two stages, for a flow rate of 9,000 m3/day (54,000 inhab-eq). The works include:

– Wastewater treatment plant for the towns of Novelda and Monforte del Cid, divided into two treatment lines of 4,500 m3/day, consisting of:

  • Water line: coarse well, pre-treatment (3 roughing channels, 2 degreasing desanders), 2 high-load biological reactors (stage A), 2 primary decanters, 2 medium-load reactors (stage B), 2 secondary decanters, 1 tertiary treatment line (UV filtration and disinfection), treated water storage.
  • Sludge line: gravity thickener for stage A sludge, flotation thickener for stage B sludge, anaerobic digester, 2 centrifugal decanters

– Discharge collection works in the aforementioned municipalities. Network of collectors and outlets (5,374 m.l.)
– Restitution works of treated water to the Vinalopó River or regulation for irrigation.
– By-pass and interconnection works for the correct operation of the system.
– Civil works and buildings.
– Electricity, drinking water and telephony.
– Access roads.

Type of services provided

Site Management:

  • Monitoring of the project
  • Topographic survey
  • Measurement of work units
  • Monitoring and control of the evolution of the tasks to be performed in order to optimize the needs and costs of the work
  • Ensure that the principles of prevention and the safety and health plan are adhered to when necessary on construction sites
  • Coordination of the control of the correct application of working methods on the site
  • Quality control