FINAL TREATMENT FACILITY FOR SHIP-GENERATED AND ASSIMILABLE LIQUID WASTE (MARPOL)
The purpose of the project is the construction of a final treatment facility for ship-generated liquid waste (Marpol 73/78 Annex I) and other assimilable liquid waste authorized by the Valencia Port Authority and the treatment of industrial water into aqueous solutions. The processes have been designed for ship-generated liquids so that the final product meets […]
DRAFTING OF THE BIDDING PROPOSAL FOR THE NABBA ES SAFA WWTP, LEBANON
In 2009, VIELCA INGENIEROS S.A. drafted a tender for the urban waste water treatment plant in the municipality of Nabaa es Safa, Lebanon. The main features of these facilities are: Flow rate: 3,000 m3/day. Equivalent inhabitants: 20,000 inhab-eq (inhabitant – equivalent = 60 g BOD5/habitant) Type of secondary treatment: activated sludge in prolonged aeration. It […]
REPAIR WORKS ON VAULT OVER QUEBRADA CHILISMUYO, SAN SALVADOR
The project consists of supervising the repair, reconstruction and/or replacement of elements that have suffered severe damage to the physical structure or foundation. Improvement of the vault over the Chilismuyo ravine located on Los Sisimiles Street, between Los Héroes Boulevard and SERTRACEN, in the municipality and department of San Salvador, broken down into the following […]
DRAFTING OF THE TENDERING PROPOSALS FOR THE OUED WWTP AND THE KALA DES SRAGHNAS WWTP IN MOROCCO
In 2012, VIELCA INGENIEROS S.A. drew up two tender projects for urban waste water treatment plants in the municipalities of Oued Laou and Kala des Sraghnas, in Morocco, since these municipalities do not have such plants. The main features of the facilities are: WWTP of Oued Laou: Flow rate: 2,000 m3/day. Equivalent inhabitants: 16.033 inhab-eq […]
TOURIST SUITABILITY BOULEVARD AND PIER PUERTO PARADA IN THE MUNICIPALITY AND DEPARTMENT OF USULUTÁN. EL SALVADOR
The project consists of the integral architectural design for the improvement of the boulevard and promenade of Puerto Parada, located in the municipality and department of Usulután. The scope of the works includes the architectural proposal, which includes a floating dock, improvement of the boulevard with rest areas, creation of a square and infrastructure in […]
PREPARATION OF THE DIAGNOSIS AND GEO-REFERENCED CATASTROPHE OF DRINKING WATER SYSTEMS IN EL SALVADOR
The project consisted of the inventory of water infrastructure, assessment and diagnosis of the drinking water and rural sanitation system not managed by ANDA at the national level. The following actions were taken: 1 .Analysis of existing information 2. Search for contacts related to SAPS drinking water systems 3. Survey of information throughout the country, […]
IMPROVEMENT OF THE LA CURVA ROAD – NEW GUINEA – UNITED NATIONS, NICARAGUA
The project consists of the improvement of 84 km of road. The area of influence of the project is composed of the La Curva junction, the intersection of the NIC-7 and NIC-71 highways, in the department of Chontales passing through the municipality of El Coral, passing through the town of El Triunfo, in the department […]
IMPROVEMENT AND EXPANSION OF DRINKING WATER SYSTEMS IN THE CITY OF MASATEPE
The project to expand and improve the drinking water system of the city of Masatepe, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2021-2041 design period. AP component […]
IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM OF THE CITY OF MATAGALPA
The project to expand and improve the drinking water and sanitary sewage system of the city of Matagalpa, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2023-2043 design […]
IMPROVEMENT OF THE DRINKING WATER AND SEWERAGE SYSTEM IN THE CITY OF SAN JORGE AND BUENOS AIRES
The works covered by the Project are, in summary, the following: Drinking water component. Collection work: Three drilled wells 500 gpm (31.55l/s),Prof. 56 m and Diam 18”. pumping stations, Three stations with submersible pump and motor of 75, 74 and 69 HP ; Drive line, 8.04 Km of HFD pipes, Diam 200 mm, 250 mm […]