Drafting of four construction projects to improve road safety on the CV-865 road, by splitting the current road by extending the existing platform, with two lanes per direction. The project covers a track length of 6.3 km, which includes the following works:

  • Previous Studies of Topography, Geology and Geotechnics, Traffic and Planning.
  • Definition of the layout and dimensioning of the road surface.
  • Dimensioning of drainage and factory works.
  • Signalling, marking and containment systems.
  • Replacement of affected services: power lines, telecommunications, supply and irrigation.
  • Design of the lighting installation.
  • Design of gardening and irrigation network.
  • Environmental Processing.