The area of action has an area of 23,000 m2 pedestrian, destined to be the square of the new City Hall.
The work carried out in the Project is:
- General land movement of the sector.
- Dimensioning of firm of the square and the rest of pedestrian areas.
- Sewage network: waste water collected through 427. 73 m of collectors with diameters of 315 and 400 mm.
- Rainwater network: rainwater is collected by means of 1,318. 32 m of collectors with diameters ranging from 315 to 800 mm.
- Irrigation network: composed of 1,680. 43 m of pipes for drip irrigation, irrigation nozzles and sprinkler irrigation.
- Medium and low voltage network and a transformation and distribution center.
- Public lighting network: 1,598 m of lighting ducts.
- Telecommunications network: 639. 59 m of telecommunications pipeline are planned.
- Gas supply network: 602. 32 m of gas pipelines are planned.
- Paving of pedestrian areas: 23,089,93 m2 of hydraulic tiles and concrete cobblestones.
- Gardening of the square and placement of tree alignment.
The Project’s Material Execution Budget amounts to €3,818,794. 44. The Total Tender Budget amounts to 5,271,463. 85 €, including the percentages of overheads, industrial profit and VAT.
Type of services provided
TECHNICAL ASSISTANCE TO SITE MANAGEMENT
DRAFTING OF THE CONSTRUCTION PROJECT:
- Memorandum and annexes
- Plans
- Specification of Technical Requirements
- Budget
- Safety and Health Study
SAFETY AND HEALTH COORDINATION
- Safety and Health Study