The project consists of the Supervision of the design, construction and equipment of the turnkey contract for the improvement of the hospital of Solola. Fast-track mode. Phase 1 PRE INVESTMENT, PHASE 2 INFRASTRUCTURE AND PHASE 3 FURNITURE AND EQUIPMENT:
Phase 1 PRE INVESTMENT: Technical studies of the pre-investment, final elaboration of the architectural, structural project with constructive details and the design of the rest of specialties such as Hydrosanitary Engineering, Electricity, Mechanics, Telecommunications, Air Conditioning, Medical Gases, Vertical Transport and other specialties necessary for the effective operation of the hospital, as well as medical equipment.
Phase 2 INFRASTRUCTURE: Ensure the quality of infrastructure works by applying appropriate control procedures. To enforce the technical, legal and administrative specifications of the contract. Apply control methods for meeting deadlines. Verify and verify the results obtained in the tests, tests and quality certifications of the materials used and of the work carried out in accordance with the established technical specifications. Certify the completion of milestones showing an activity or activities has been completed.
Phase 3 MEDICAL EQUIPMENT: Authorize modifications to the lists of equipment presented in the accepted offer, provided that these imply a functionality better or similar to the offer and established records and specific justifications must be left. Verify correct installation of fixed equipment and distribution of mobile equipment, validate and certify equipment delivery activities according to the schedule of payments for lump sums accepted in the contract or approved and current delivery lists.
TYPE OF SERVICES PROVIDED:
- Site Management
- Supervision and support in the permit management processes before public institutions (CONRED, MARN, MSPAS, etc.)
- Supervision of construction and compliance with technical specifications.
- Monitoring and control of the physical and financial progress of the work.
- Follow-up on compliance with WFP implementation and SYSO measures.
- Verification of compliance with each contractor’s work programs.
- Drafting documentation
- Preparation of monthly and weekly reports to the owner on quality control, site supervision, environmental monitoring and occupational health and safety.