UTIEL, VALENCIA

UPGRADING OF AIR CONDITIONING AND VENTILATION FACILITIES AT THE RAMBAL THEATRE

Working field

Industrial Facilities

Client

AYUNTAMIENTO DE UTIEL

Ending Year

2022

Budget

306.376,91 €

Drafting of the project to replace and improve the air conditioning and ventilation system of the Rambal de Utiel theatre, which was built in 1896 and has a capacity of 1032 locations.

 

The works carried out consisted of:

  • Installation of a combined air-water air-conditioning system.

Electrical installation at low voltage.

FEATURED

PROJECTS