SANITARY SEWERAGE SYSTEM OF THE CITY OF MATAGALPA
The project to expand and improve the sanitary sewerage system is aimed at solving the current deficit situation and providing the city of Matagalpa with a drinking water and sanitary sewerage system with the necessary capacity to meet the demand of the population expected by the end of the design period 2023 – 2043. The […]
VERIFICATION OF THE FUNCTIONING AND SUSTAINABILITY OF THE URBAN WATER SYSTEM IN THE MUNICIPALITY OF RAXRUHÁ
The evaluation was carried out by conducting fieldwork guided by a survey in which the following aspects of relevance were defined: Operation of the system: State of infrastructure. Volume of water produced and served by the system. Endowment per user and per day. Hours of daily service. Quality of the water offered, evaluated from the […]
CONSTRUCTION OF THE COMPREHENSIVE SANITATION OF THE MUNICIPALITY OF LA CELA DE NÚÑEZ IN MURO DE ALCOY
The first work carried out consists of the capture of the existing general collector upstream of the discharge, specifically at the level of the road connecting to the CV-705. There a logging well has been executed with a small ledge from which a newly executed manifold starts. From this junction well is born a buried […]
REPAIR OF THE CORONATION ROAD OF THE DAM AND ACCESS TO THE TRANSFORMATION CENTRE OF THE RESERVOIR DEL REGAJO, TM DE JÉRICA
The work carried out consisted of providing technical assistance to the voluntary management of the works. The main features are: Rethinking the access road to the dam and the coronation road Preparation of the land to be subsequently paved Placement of perimeter curb Demolition of the old coffins of the coronation road and execution of […]
IMPROVEMENT OF THE SAFETY OF FACILITIES AND ACCESS TO THE ARENÓS DAM
The work carried out consisted of providing technical assistance to the voluntary management of the works. The main features are: Improvement of access roads and dam interiors Upgrading of dam tunnels, wells and chambers Signalling and marking of the facilities, considering the installation of six barriers for vehicles Construction of a new access bridge to […]
GEO-REFERENCED COMMERCIAL CADASTRE OF THE METROPOLITAN REGION, EL SALVADOR
The geo-referencing works carried out are: preparation of information and planning of cadastral works by means of control tables by area indicating the routes contained in each area field information gathering and digitization of information geo referencing of all home connections from the access counters to the supply points creation of typing manuals with data […]
IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM IN THE CITY OF MASAYA, NICARAGUA
The work involved the supervision of the following projects: Construction of pipelines and distribution lines for the improvement and expansion of the drinking water system in the city of Masaya Construction and rehabilitation of storage tanks for the improvement and expansion of the drinking water system in the city of Masaya construction and drilling of […]
REGULATING DAM FOR IRRIGATION FOR THE ROYAL MONCADA DITCH IN THE PUÇOL RIVER T.M.
Technical assistance to the optional management of the works consisting of a reservoir for regulating and storing water for irrigation of reinforced concrete with dimensions of 55×160 m, with a total capacity of about 32,500,00 m3, to optimize the use of water coming from the real canal of Moncada and guarantee an efficient supply of […]
PROTOCOL OF ACTION TO RESOLVE WATER-RELATED CONFLICTS
Development of a work plan with the methodology for the analysis of information. Preparation of proposals for user manuals. Development of visualization interface of crowdsourcing results. Analysis, filling and homogenization of historical time series of meteorological variables at 142 telemetric hydrometeorological stations. Establishment of processes and generation of tools for quality control of variable data. […]
NEW OLIVA-NORTE WWTP
Drafting of the above-mentioned project which includes the following infrastructures: Pulse conduction of regenerated water, with a total length of approximately five kilometres, for the transport of effluent from the new WWTP to a control tank with a capacity of approximately thirty thousand cubic metres. Network of wastewater collectors, with a total length of approximately […]