DRAFTING OF THE BIDDING PROPOSAL FOR THE NABBA ES SAFA WWTP, LEBANON
In 2009, VIELCA INGENIEROS S.A. drafted a tender for the urban waste water treatment plant in the municipality of Nabaa es Safa, Lebanon. The main features of these facilities are: Flow rate: 3,000 m3/day. Equivalent inhabitants: 20,000 inhab-eq (inhabitant – equivalent = 60 g BOD5/habitant) Type of secondary treatment: activated sludge in prolonged aeration. It […]
REPAIR WORKS ON VAULT OVER QUEBRADA CHILISMUYO, SAN SALVADOR
The project consists of supervising the repair, reconstruction and/or replacement of elements that have suffered severe damage to the physical structure or foundation. Improvement of the vault over the Chilismuyo ravine located on Los Sisimiles Street, between Los Héroes Boulevard and SERTRACEN, in the municipality and department of San Salvador, broken down into the following […]
DRAFTING OF THE TENDERING PROPOSALS FOR THE OUED WWTP AND THE KALA DES SRAGHNAS WWTP IN MOROCCO
In 2012, VIELCA INGENIEROS S.A. drew up two tender projects for urban waste water treatment plants in the municipalities of Oued Laou and Kala des Sraghnas, in Morocco, since these municipalities do not have such plants. The main features of the facilities are: WWTP of Oued Laou: Flow rate: 2,000 m3/day. Equivalent inhabitants: 16.033 inhab-eq […]
PREPARATION OF THE DIAGNOSIS AND GEO-REFERENCED CATASTROPHE OF DRINKING WATER SYSTEMS IN EL SALVADOR
The project consisted of the inventory of water infrastructure, assessment and diagnosis of the drinking water and rural sanitation system not managed by ANDA at the national level. The following actions were taken: 1 .Analysis of existing information 2. Search for contacts related to SAPS drinking water systems 3. Survey of information throughout the country, […]
IMPROVEMENT AND EXPANSION OF DRINKING WATER SYSTEMS IN THE CITY OF MASATEPE
The project to expand and improve the drinking water system of the city of Masatepe, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2021-2041 design period. AP component […]
IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM OF THE CITY OF MATAGALPA
The project to expand and improve the drinking water and sanitary sewage system of the city of Matagalpa, is aimed at solving the current supply and installation problems affecting important sectors of the population and generating the installed capacity needed to meet the demand of the population expected at the end of the 2023-2043 design […]
IMPROVEMENT OF THE DRINKING WATER AND SEWERAGE SYSTEM IN THE CITY OF SAN JORGE AND BUENOS AIRES
The works covered by the Project are, in summary, the following: Drinking water component. Collection work: Three drilled wells 500 gpm (31.55l/s),Prof. 56 m and Diam 18”. pumping stations, Three stations with submersible pump and motor of 75, 74 and 69 HP ; Drive line, 8.04 Km of HFD pipes, Diam 200 mm, 250 mm […]
STUDIES AND DESIGNS FOR THE IMPROVEMENT AND EXPANSION OF THE DRINKING WATER SYSTEM OF DIRIAMBÁ
The works covered by the Project are, in summary, the following: Drinking water component. Collection work: 20 wells drilled from 14 to 22 l/s, Prof. from 320 to 380 m and Diam of 18″. Pumping stations, 20 Submersible pump and motor stations Drive line Supply and installation of 11,586 km of HFD piping including HFD […]
PROGRAMME TO IMPROVE ACCESS TO AND QUALITY OF WATER AND SANITATION SERVICES IN INTERMEDIATE CITIES IN HONDURAS
The BCIE contracted the services of VIELCA INGENIEROS to prepare the diagnosis, investment plan and terms of reference required for the studies and designs of the investments needed to renovate, expand and improve water and sanitation infrastructures, improve the quality, access and sustainability of services and strengthen the capacity of service providers in four intermediate […]
SUPERVISION OF THE DESIGN AND CONSTRUCTION OF SMALL-HAZARD IRRIGATION SYSTEMS
This project involved the establishment of an irrigation system that would initially benefit hundreds of families, most of them low-income and subsistence farming, living in the rural communities of El Plantel, Las Lomas, El Espinal and the urban centre of the municipality of Lamani, Comayagua Department. VIELCA INGENIEROS carried out the tasks of Supervision of […]