WORKS FOR THE REUSE OF TREATED WASTE WATER IN THE SOUTHERN ALBUFERA

Detailed description of the project The existing treatment plant collects wastewater from the urban centres of Alginet, Almussafes, Benifaió and Sollana, and from their industrial estates, resulting in an essential infrastructure for the good ecological status of the Natural Park of L’Albufera de Valencia. This WWTP is designed to serve 199,000 equivalent inhabitants, with a […]

CONSTRUCTION WORK FOR THE NEW WWTP OF ALCALÀ DE XIVERT

Detailed description of the project The following works are planned: New system of sewerage pipes (3,734 m driven and 1,140 m in gravity) and two new pumping stations, to convey the wastewater generated in the coastal area of Alcossebre to the new treatment plant of Alcalá de Xivert. Construction of the new Alcalà de Xivert […]

ENLARGEMENT WITH TERTIARY TREATMENT OF QUART-BENAGER WWTP

Detailed description of the project The works carried out consist of the extension of the Quart-Benáger WWTP, so that a tertiary treatment for the design flow, 60,000 m3/d (300,000 inhab-eq) is incorporated into it. The works have consisted of: Interception of the outlet water of the secondary decanters prior to its passage to disinfection; diverting […]

MANAGEMENT OF THE RENOVATION WORKS OF THE OLD WWTP OF BENIDORM

Detailed description of the project This WWTP was built in 1984, and although later works have been carried out to extend it, these have not been enough, so it has been necessary to undertake these works, aimed at solving the various deficiencies that it presented. The works have consisted of the reform of the Benidorm […]

PROJECT FOR THE CONSTRUCTION OF A WATER TREATMENT PLANT IN LA NUCIA

Detailed description of the project The Municipality’s Master Plan for Exploitation includes the installation of a new water purification plant to eliminate the sporadic events of increased water turbidity and the presence of geosmin (a substance produced by some bacteria, which gives the water a taste and smell of mouldy soil). These events occur in […]

WORKS BY THE GENERAL COLLECTORS AND WWTP OF NOVELDA AND MONFORTE DEL CID

Detailed description of the project The works consist of the construction of the collector system and a new treatment plant using biological treatment in two stages, for a flow rate of 9,000 m3/day (54,000 inhab-eq). The works include: – Wastewater treatment plant for the towns of Novelda and Monforte del Cid, divided into two treatment […]

CONSTRUCTION PROJECT FOR THE IMPROVEMENT WORKS OF THE WWTP OF VORA RIU IN VILA REAL

Detailed description of the project The objectives to be achieved by the Sanitation Entity with the realization of the actions of improvement in the existing WWTP of Vora Riu, are: Expansion of treatment capacity to absorb the growth of the municipality, both urban and industrial. Increased flexibility and guarantees of the purification process. Optimization of […]

IMPROVEMENT OF FONT DE LA PEDRA WASTE WATER TREATMENT PLANT

Detailed description of the project Due to the inability of the current plant to treat both the incoming flow and the high pollutant load (discharges from textile industries and mills), the existing facilities need to be renovated/expanded. Furthermore, due to the advanced state of eutrophication in which the Beniarrés reservoir is located, to which the […]