REFORM OF THE WWTP OF CASTELLÓN
The main objectives to be achieved with this project to improve and reform the Castellón WWTP, in order of priority, are: Minimize the number of unit processes involved in the water and sludge line. This implies a change in the type of treatment, i.e. a change from a conventional activated sludge process to a prolonged […]
DRINKING WATER TREATMENT PLANT FOR THE MUNICIPALITY OF LORIGUILLA
Work on a drinking water treatment plant is being carried out in the municipality of Loriguilla, which is currently supplied by a drinking water treatment plant using reverse osmosis. The project aims to develop a solution to deal with the following situations: Stopped by any cause of the osmosis plant. Depletion of allotted well water […]
DRINKING PLANT LAS PAVAS
A comprehensive technical study has been carried out to define short- and medium-term action for the rehabilitation of the raw water catchment works and each of the unitary processes of the drinking water treatment plant in Las Pavas, El Salvador. This makes it possible to improve the conditions of collection, treatment and operation once the […]
WWTP PEÑÍSCOLA
The project defines the facilities of a new Wastewater Treatment Plant (WWTP) for the treatment of wastewater in the municipality of Peñíscola, reserving space for future expansion. It includes new sewerage pipelines from the urban area to the site of the WWTP. There is also the refurbishment and rehabilitation of the existing network, as well […]
CONCESSION PROJECT FOR CHJ OF GROUNDWATER FOR NON-POTABLE SUPPLY TO GYMNASIUM
The project consisted of the drafting of the Technical Report or concession project to be attached to the groundwater concession.
PROJECT FOR THE ADAPTATION OF SEVILLE’S INTEGRATED SEWERAGE SYSTEM
The work carried out consisted of the drafting of a project for the rehabilitation of the Emisario Puerto General Collector (S-200) in the Municipal District of Seville. To this end, it was necessary to carry out a topographical survey of the access covers to the gallery, to propose the access of materials and to design […]
FLOODABILITY STUDY OF THE DOÑA BLANCA GOLF URBANIZATION
A Floodability Study of the San Miguel River and areas with geomorphological hazards due to the formation of wetlands was carried out in the Doña Blanca Golf de Torreblanca urbanization. To this end, the following processes were carried out: Development of a detailed Floodability Study, which contained the following documentation: Pseudo-distributed hydrological study in Hec-HMS […]
RIVER HYDRAULICS STUDY ON PETROLEUM EXTRACTION IN THE JIBOA RIVER
The main features of the project are: Field work to determine: Topographic survey, based on photogrammetric restitution of flight drone of 10 km of channel with an average width of 300 m and mooring to the geodetic network with complementary triangulation by means of total station. Processing of the national UDAR flight of 2×2 m […]
HYDROLOGICAL AND HYDRAULIC STUDY TO MEET PATRICOVA AND CHJ REQUIREMENTS
The work carried out by Vielca Ingenieros consisted in responding to the reports of PATRICOVA and CHJ on the danger of flooding of the plot to be developed in the western sector of Villareal, in which a detailed study was given according to the aforementioned requirements of the channels: Barranc del Esbarzers. Barranc del Ràtils. […]
UPDATE OF THE LLIRIA SUPPLY MASTER PLAN
The work consisted of the Development of the Supply Master Plan for the Management of the Municipal Potable Water Supply Service of the Municipality. At the same time, the modeling of the supply network was carried out using the EPANET software. The design population for the scenario was 22,648 inhabitants and that of the future […]