DEMARCATION OF THE HYDRAULIC PUBLIC DOMAIN IN THE BARRANC DEL MALET AND THE VACA RIVER

The project consisted of the following work: Cartography and topographic surveys at a scale of not less than 1:1000; management of rainfall information. Hydrological and hydraulic studies, application of mathematical models, other studies. List of adjacent owners and preparation of cadastral plans. Processing of public information ; including payment of advertisements, settlement of claims. Management […]

FINAL DESIGN OF THE WASTEWATER TREATMENT SYSTEM FOR THE CITY OF BILWI

The work carried out consisted of the drafting/elaboration of the Final Design of the Wastewater Treatment System (PTAR of Bilwi). The planned works consist of the following actions: The Bilwi PTAR has been designed for a flow of 15,769.7 m3/day; that is 164,264 inhabitants with an endowment of 120/l/day/inhabitant. As for the treatment line, it […]

DAMPING OF MACRO RAIN DRAINAGE

This project of damping works of the macro storm drainage in the Metropolitan Area of San Salvador (AMSS) establishes the development of lagoons and SUDS as the proposal to mitigate the effects of river flooding in the urban area. Criteria are presented: economic-financial, socio-political, environmental and hydrological-hydraulic; to limit the typology and location. The joint […]

MASTER PLAN FOR RAINWATER MANAGEMENT

PLAN MAESTRO PARA LA GESTIÓN DE AGUAS

The Master Plan for the Sustainable Management of Rainwater in the Metropolitan Area of San Salvador (AMSS) was created with the fundamental objective of establishing the actions necessary for the proper functioning of rainwater drainage in the AMSS. The work carried out consisted of drafting the referenced project for the Lamination Dams called “Colonia Luz”, […]