EMERGENCY WORKS AND REPAIR OF MARIA CRISTINA DAM RELIEF
Technical assistance to the voluntary management of the project, with the following characteristics: lifting of the flap of the bowl, on the part affected by the damage and up to the downstream end sanitation of the area to reach the rocky limestone substrate infill with escollera taken with concrete up to the level of support […]
PHOTOVOLTAIC INSTALLATION FOR IRRIGATION WELL, FOR THE COMMUNITY OF IRRIGATORS OF HONDÓN-MONOVAR
The purpose of the project is the design of a photovoltaic panels plant capable of producing a power of up to 200 kW, in order to power the well pumping equipment, which is currently connected to the grid. For this purpose, an installation consisting of a photovoltaic panel generator, consisting of 500 panels of 450 […]
CONSTRUCTION PROJECT OF ELECTRICAL UTILIZATION AT THE FOOT OF THE DAM OF ARENÓS RESERVOIR
The purpose of the Project is to describe the construction works for the hydroelectric exploitation at the foot of the dam, of the Arenós reservoir on the Mijares River in the province of Castellón. The main work planned is as follows: – Pipes: includes the installation of a steel pipe with a diameter of 1,550 […]
100 MW POWER PLANT IN KERANIGANJ, DHAKA
As part of its programme to increase energy production, the Bangladesh Power Development Board (BPDB) has initiated the construction of a number of power plants throughout the country. One of the new plants, which has been in operation since March 2012, is located in the city of Keraniganj in Dhaka District. The power plant has […]