CONSTRUCTION AND COMMISSIONING OF THE FACILITIES OF THE VALENCIA INTERIOR CONSORTIUM

The project consists of the construction of the recycling and composting and disposal facilities of the Zonal Solid Waste Plan of Zones VI, VII and IX of the Valencian Community and has an approximate budget of 74,064,065,21 €. The main features of the work are: Mass-collected municipal waste transfer stations, including the transport of waste […]

CONSTRUCTION OF THE SECOND CELL OF THE VILLENA LANDFILL

The project consists of the construction of the second municipal solid waste disposal cell of a waste treatment plant and has a budget of approximately €1,721,157.68. The main features of the work are: The landfill serves a population equivalent to 180,000 inhabitants corresponding to the Zonal Waste Plan of Zone XIII of the Valencian Community. […]

NEW MARSHALLING FACILITIES IN THE PORT OF CASTELLÓN

The purpose of this Project is to define, justify and evaluate the new facilities that Garbaport S.L. will build and operate, once the relevant administrative concession has been approved. These facilities shall be intended for the industrial activity of collecting, separating, recovering and disposing of waste delivered by ships to the port. The plot on […]

SEALING AND ENVIRONMENTAL RESTORATION OF THE XÀBIA MUNICIPAL WASTE LANDFILL

The project consists of the sealing and environmental restoration of an inert waste cell and has an approximate budget of €1,068,886.03. It is estimated that a total of 1.4 million tonnes of inert waste has been dumped. The main impact on the natural environment of the site where the landfill is located is that it […]

URBAN WASTE MANAGEMENT PROJECT IN ZONE XVII OF THE VALENCIAN COMMUNITY

The project consists of the construction of the recycling and composting and disposal facilities of the Zonal Plan for Solid Waste of Zone XVII of the Valencian Community and has an approximate budget of €117,354,714.60. The main features of the work are: Municipal Waste Recovery Facilities, which have an independent line of organic matter from […]

RECYCLABLE WASTE COLLECTION CENTRE IN ASPE

The work carried out consists of the drafting of the construction project, site management and safety and health coordination of a clean spot (ecopark), which has a budget of approximately €953,311.38. The main features of the work are: Aspe and the surrounding area. Aspe and the surrounding area. 3,000 m3 of excavations. 1,800 m3 of […]

MANAGEMENT PROJECT FOR AREA XIV OF THE PIR

The work consisted of the Drafting of the ESR Management Plan, which includes the detailed Engineering for the Remodeling and Adaptation to the requirements of Zonal Plan XIV of the Composting and Valorization complex of RU in Piedra Negra, Xixona. The documentation prepared establishes the Management and Operation Plan, includes a Preliminary Project of Facilities, […]

ENVIRONMENTAL CONTROL AND MONITORING PROCESSES OPERATION FACILITIES CVI-V5

The waste treatment facilities consist of two treatment plants (in Llíria and Caudete de las Fuentes), a transfer plant in Chiva, a non-hazardous waste landfill in Caudete de las Fuentes, 26 fixed and 9 mobile eco-parks, as well as a further 29 collection points for bulky waste. All these infrastructures are controlled by Vielca, which […]

DRAFTING OF 8 PRELIMINARY PROJECTS OF CONTRIBUTION AREAS AND ECOPARKS

This work consists of the realization of 8 preliminary projects of contribution areas and ecoparks. It also includes the study of the access(s) according to the circumstances of both the contribution area and the road (slope, visibility, traffic, speed, etc…). The documentation to be prepared corresponds to the following scheme: A report, in which the […]