ALICANTE, SPAIN

RECYCLABLE WASTE COLLECTION CENTRE IN ASPE

Working field

Waste Treatment

Client

AYUNTAMIENTO DE ASPE

Ending Year

2011

Budget

953.311,38 €

The work carried out consists of the drafting of the construction project, site management and safety and health coordination of
a clean spot (ecopark), which has a budget of approximately €953,311.38.

The main features of the work are:

  • Aspe and the surrounding area.
    Aspe and the surrounding area.
  • 3,000 m3 of excavations.
  • 1,800 m3 of floor space.
  • 350 Tm of bituminous mixture in pavements.
  • 300 m3 of concrete in walls and 25 Tm of steel.
  • 12 containers of 26 m3 and 1 container of 18 m3 of sheet steel.

security and recording technologies.
security and recording technologies.

The facility also has a weighing scale and environmental classroom.

Type of services provided

Drafting of Project:

  • Memory and Attachments.
  • Plans.
  • Specific Technical Requirements.
  • Budget.
  • Safety and Health Study.

Construction Site Management:

  • Topography of the works.
  • Monitor the progress of work.
  • Quality control.
  • Waste management.
  • Environmental control.

Health and Safety Coordination:

  • To ensure that the undertakings involved in the work comply with the principles of
    prevention and the requirements of the health and safety plan.
  • Check the correct application of the working methodologies
    described in the project.