LATINA, MADRID

DRAFTING OF THE PROJECT FOR THE CONSTRUCTION OF THE SCHOOL OF MUSIC AND DANCE

Working field

Architecture and Urban Planning

Client

AYUNTAMIENTO DE MADRID

Ending Year

2022

Budget

3.646.031,11 €

The work consisted of drafting the project for the construction of a music and dance school. The building has three floors (a basement and two above ground) and the total built area is 3,033.04 m2.

The work consisted of:

  • Architectural design of the building and distribution of the spaces.
  • Calculation of structures and foundations.
  • Water Receiving Facility (Plumbing and Sanitation).
  • Installation of air conditioning, ventilation and ACS.
  • Electrical facilities.
  • Telecommunications facilities.
  • Fire protection equipment.

FEATURED

PROJECTS