Drafting of the construction project for the upgrading of the N-232 road, both in plan and elevation, and the reorganization of accesses, on a track length of 5.3 km, which includes the following actions:
- Previous Studies of Topography, Geology and Geotechnics, Traffic and Planning.
- Definition of the layout and dimensioning of the road surface.
- Dimensioning of drainage and factory works.
- Calculation of the different structures: Bridge over the Bergantes River, retaining walls, underpasses, etc.
- Signalling, marking and containment systems.
- Acoustic study and calculation of acoustic screens.
- Replacement of affected services: power lines, telecommunications, supply, roads and access, livestock routes.
- Drafting of the Environmental Impact Study.
- Elaboration of the Landscape Integration Study.